How To Get Started!

Schedule your mobile training

Review Course Catalog

Baker Academy offers a long list of training options. We encourage you to look at the catalog for course listings and descriptions.

Submit Mobile Training Request

Please submit a Mobile Training request by emailing the training team at roofingacademy@bakerroofing.com.

We Will Follow-up

We will follow-up to your email to officially schedule your training!

Course Catalog:

Mobile Training Options:

TPO Class Offerings

Class #
Description
Time
TPO 1
Calibration Welds: Achieving proper 2” hand welds.
90 Min.
TPO 2
Field Wraps: Achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base.
90 Min.
TPO 3
Inside Corner: Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch)
90 Min.
TPO 4
TPO Cleaning: Cleaning and prepping TPO. Using the correct cleaning procedure will enhance the integrity of the weld on TPO membrane.
60 Min.
TPO 5
Outside Corner: Wrapping curbs, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles.
90 Min.
TPO 6
Roof Drains: Installing drains. Showing the steps from the bottom up, including how to install bolts and make the drain water tight.
90 Min.

EPDM Class Offerings

Class #
Description
Time
EPDM 1
Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly.
90 Min.
EPDM 2
Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 1” base. Roll on technique with lap sealant.
90 Min.
EPDM 3
Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles.
90 Min.
EPDM 4
Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch.
90 Min.
EPDM 5
Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight.
60 Min.

PVC Class Offerings

Class #
Description
Time
PVC 1
Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly.
90 Min.
PVC 2
Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base
90 Min.
PVC 3
Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles.
90 Min.
PVC 4
Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch.
90 Min.
PVC 5
Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight.
60 Min.

MOD BIT Class Offerings

Class #
Description
Time
MOD BIT 1
Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly.
90 Min.
MOD BIT 2
Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot with 8” pipe covering, 2” fingers around the pipe, and a 12”x12” target patch.
90 Min.
MOD BIT 3
Outside Corner: Baker Best Practice wrapping a modified curb using the ABBC technique. Installing cant-strips around the curb, putting the base around, wrapping the base with cap-sheet , following the slope of the roof.
90 Min.
MOD BIT 4
Inside Corner: Baker Best Practice using liquid flashing for pipe wraps and scuppers , the proper levels and how much time you have when liquid flashing mix is prepared.
90 Min.

Robot Welder Class Offerings

Class #
Description
Time
Robot 1
Robot Welder: How to properly maintain, calibrate, and turn on an Auto Robot Welder. How to use the robot welder in the field and test the robot welds before use.
90 Min.

Drip Edge (Steep) Class Offerings

Class #
Description
Time
Drip Edge 1
Outside Corner: Baker Best Practices for creating a 45 degree angle on the outside corner of drip edge. Correct lapping of drip edge.
90 Min.
Drip Edge 2
Inside Corner: Baker Best Practice for creating 45 degree angle on inside corners. Cutting drip edge to cover valley.
90 Min.
Drip Edge 3
Gable Transition: Baker Best Practice for gable transition drip edge creates watertight installation with proper aesthetic.
90 Min.
Drip Edge 4
Ridge: Baker Best Practice for installing ridge drip edge with one piece and symmetrical appearance.
60 Min.

Flashing (Steep) Class Offerings

Class #
Description
Time
Residential Flashing 1
Apron Flashing: Baker best practice for installing apron flashing with clips and correct corner installation.
90 Min.
Residential Flashing 2
Outside Corner: Baker Best Practice for installing pre-cut outside corners and incorporating them into step flashing.
60 Min.
Residential Flashing 3
Inside Corner on a Valley: Baker Best practice for installing apron flashing on a wall at the top of a valley.
90 Min.
Residential Flashing 4
Step Flashing: Baker Best Practice showing proper nail placement and lap coverage.
60 Min.
Residential Flashing 5
Outside Corner on a Hip: Baker Best Practice for installing apron flashing on an outside wall corner on top of a hip.
90 Min.
Residential Flashing 6
Pipe Boot: Baker Best Practice for installing pipe boot flashing with shingle and sealant integration.
90 Min.

Asphalt Shingles Class Offerings

Class #
Description
Time
Asphalt Shingles 1
Roof Layout: Baker Best Practice explaining how to measure the roof and pop lines to ensure proper installation.
60 Min.
Asphalt Shingles 2
Step and Nail Patterns: Baker Best Practices showing where to install nails and how to set up step patterns to ensure roof is water tight.
60 Min.
Asphalt Shingles 3
Cap Shingles: Baker Best Practice showing how to create hip starter shingles, cap cuts, proper nail placement and cap termination.
90 Min.
Asphalt Shingles 4
Ridge Vent: Baker Best Practice for installing ridge vent using the proper layout, correct nails, and vent placement.
60 Min.
Asphalt Shingles 5
Rake Edge: Baker Best Practice ensuring the rake edges are clean, straight, and neat.
60 Min.

Mobile Training Example:

(2 Day Example)

Day 1 Time
Day 1 Class
8AM
Introduction/Safety
8:30AM
TPO-Inside Corners
10:15AM
Mod Bit-Liquid Flashing
12PM
Lunch
1PM
Drip Edge-Outside Corner
2:45PM
Asphalt Shingles-Cap Shingles
4:15PM
Break
4:30PM
Conclusion/Questions
Day 2 Time
Day 2 Class
8AM
Step Counter Flashing
10AM
Break
12PM
Lunch
1PM
Robot Welder
2:30PM
Break
2:45PM
Mod Bit-Curb Wrap
4:15PM
Break
4:30PM
Conclusion/Questions