Commercial Mobile Training Course Catalog Options:
TPO Class Offerings
Class # | Description | Time |
---|---|---|
TPO 1 | Calibration Welds: Achieving proper 2” hand welds. | 90 Min. |
TPO 2 | Field Wraps: Achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base. | 90 Min. |
TPO 3 | Inside Corner: Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch) | 90 Min. |
TPO 4 | TPO Cleaning: Cleaning and prepping TPO. Using the correct cleaning procedure will enhance the integrity of the weld on TPO membrane. | 60 Min. |
TPO 5 | Outside Corner: Wrapping curbs, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles. | 90 Min. |
TPO 6 | Roof Drains: Installing drains. Showing the steps from the bottom up, including how to install bolts and make the drain water tight. | 90 Min. |
EPDM Class Offerings
Class # | Description | Time |
---|---|---|
EPDM 1 | Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly. | 90 Min. |
EPDM 2 | Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 1” base. Roll on technique with lap sealant. | 90 Min. |
EPDM 3 | Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles. | 90 Min. |
EPDM 4 | Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch. | 90 Min. |
EPDM 5 | Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight. | 60 Min. |
PVC Class Offerings
Class # | Description | Time |
---|---|---|
PVC 1 | Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly. | 90 Min. |
PVC 2 | Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base | 90 Min. |
PVC 3 | Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles. | 90 Min. |
PVC 4 | Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch. | 90 Min. |
PVC 5 | Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight. | 60 Min. |
MOD BIT Class Offerings
Class # | Description | Time |
---|---|---|
MOD BIT 1 | Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly. | 90 Min. |
MOD BIT 2 | Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot with 8” pipe covering, 2” fingers around the pipe, and a 12”x12” target patch. | 90 Min. |
MOD BIT 3 | Outside Corner: Baker Best Practice wrapping a modified curb using the ABBC technique. Installing cant-strips around the curb, putting the base around, wrapping the base with cap-sheet , following the slope of the roof. | 90 Min. |
MOD BIT 4 | Inside Corner: Baker Best Practice using liquid flashing for pipe wraps and scuppers , the proper levels and how much time you have when liquid flashing mix is prepared. | 90 Min. |
Service 201 Class Offerings
Class # | Description | Time |
---|---|---|
Service 201-1 | Conical Pipes: Baker Best Practice for wrapping conical pipes using a simple formula to achieve accurate detail. | 90 Min. |
Service 201-2 | 3/4″ Field Wrap Pipes: Baker Best Practices for achieving proper field-fabricated pipe boot with 8″ pipe covering, 2″ fingers around the pipe, and a 12″x12″ target patch. | 90 Min. |
Service 201-3 | 4pc ModBit Drain Detail: Baker Best Practice wrapping a modified drain using the 4 pc technique. Installing modified drain going step-by-step from start to finish. | 90 Min. |
Service 201-4 | Pitch Pocket Installation: Baker Best Practice using pitch pockets for pipes on the roof. Step-by-step from beginning to end. | 90 Min. |
Edge Metal (ES-1) Class Offerings
Class # | Description | Time |
---|---|---|
Drip Edge 1 | Outside Corner: Baker Best Practices for creating a 45-degree angle on the outside corner of drip edge. | 90 Min. |
Drip Edge 2 | Inside Corner: Baker Best Practice for creating a 45-degree angle on inside corners. | 90 Min. |
Drip Edge 3 | Gravel Stop Inside Corner: Baker Best Practice for gravel stop that creates watertight installation with proper aesthetic. | 90 Min. |
Drip Edge 4 | Gravel Stop Outside Corner: Baker Best Practice for gravel stop that creates watertight installation with proper aesthetic. | 60 Min. |
Drip Edge 5 | Coping Inside & Outside One Piece: Baker Best Practice for coping that creates watertight installation with proper aesthetic. | 120 Min. |
Robot Welder Class Offerings
Class # | Description | Time |
---|---|---|
Robot 1 | Robot Welder: How to properly maintain, calibrate, and turn on an Auto Robot Welder. How to use the robot welder in the field and test the robot welds before use. | 90 Min. |