TPO Class Offerings

Class #
Description
Time
TPO 1
Calibration Welds: Achieving proper 2” hand welds.
90 Min.
TPO 2
Field Wraps: Achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base.
90 Min.
TPO 3
Inside Corner: Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch)
90 Min.
TPO 4
TPO Cleaning: Cleaning and prepping TPO. Using the correct cleaning procedure will enhance the integrity of the weld on TPO membrane.
60 Min.
TPO 5
Outside Corner: Wrapping curbs, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles.
90 Min.
TPO 6
Roof Drains: Installing drains. Showing the steps from the bottom up, including how to install bolts and make the drain water tight.
90 Min.

EPDM Class Offerings

Class #
Description
Time
EPDM 1
Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly.
90 Min.
EPDM 2
Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 1” base. Roll on technique with lap sealant.
90 Min.
EPDM 3
Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles.
90 Min.
EPDM 4
Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch.
90 Min.
EPDM 5
Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight.
60 Min.

PVC Class Offerings

Class #
Description
Time
PVC 1
Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly.
90 Min.
PVC 2
Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base
90 Min.
PVC 3
Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles.
90 Min.
PVC 4
Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch.
90 Min.
PVC 5
Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight.
60 Min.

MOD BIT Class Offerings

Class #
Description
Time
MOD BIT 1
Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly.
90 Min.
MOD BIT 2
Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot with 8” pipe covering, 2” fingers around the pipe, and a 12”x12” target patch.
90 Min.
MOD BIT 3
Outside Corner: Baker Best Practice wrapping a modified curb using the ABBC technique. Installing cant-strips around the curb, putting the base around, wrapping the base with cap-sheet , following the slope of the roof.
90 Min.
MOD BIT 4
Inside Corner: Baker Best Practice using liquid flashing for pipe wraps and scuppers , the proper levels and how much time you have when liquid flashing mix is prepared.
90 Min.

Service 201 Class Offerings

Class #
Description
Time
Service 201-1
Conical Pipes: Baker Best Practice for wrapping conical pipes using a simple formula to achieve accurate detail.
90 Min.
Service 201-2
3/4″ Field Wrap Pipes: Baker Best Practices for achieving proper field-fabricated pipe boot with 8″ pipe covering, 2″ fingers around the pipe, and a 12″x12″ target patch.
90 Min.
Service 201-3
4pc ModBit Drain Detail: Baker Best Practice wrapping a modified drain using the 4 pc technique. Installing modified drain going step-by-step from start to finish.
90 Min.
Service 201-4
Pitch Pocket Installation: Baker Best Practice using pitch pockets for pipes on the roof. Step-by-step from beginning to end.
90 Min.

Edge Metal (ES-1) Class Offerings

Class #
Description
Time
Drip Edge 1
Outside Corner: Baker Best Practices for creating a 45-degree angle on the outside corner of drip edge.
90 Min.
Drip Edge 2
Inside Corner: Baker Best Practice for creating a 45-degree angle on inside corners.
90 Min.
Drip Edge 3
Gravel Stop Inside Corner: Baker Best Practice for gravel stop that creates watertight installation with proper aesthetic.
90 Min.
Drip Edge 4
Gravel Stop Outside Corner: Baker Best Practice for gravel stop that creates watertight installation with proper aesthetic.
60 Min.
Drip Edge 5
Coping Inside & Outside One Piece: Baker Best Practice for coping that creates watertight installation with proper aesthetic.
120 Min.

Robot Welder Class Offerings

Class #
Description
Time
Robot 1
Robot Welder: How to properly maintain, calibrate, and turn on an Auto Robot Welder. How to use the robot welder in the field and test the robot welds before use.
90 Min.