Mobile Training
Mobile Training Course Catalog Options:
TPO Class Offerings
Class # | Description | Time |
---|---|---|
TPO 1 | Calibration Welds: Achieving proper 2” hand welds. | 90 Min. |
TPO 2 | Field Wraps: Achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base. | 90 Min. |
TPO 3 | Inside Corner: Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch) | 90 Min. |
TPO 4 | TPO Cleaning: Cleaning and prepping TPO. Using the correct cleaning procedure will enhance the integrity of the weld on TPO membrane. | 60 Min. |
TPO 5 | Outside Corner: Wrapping curbs, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles. | 90 Min. |
TPO 6 | Roof Drains: Installing drains. Showing the steps from the bottom up, including how to install bolts and make the drain water tight. | 90 Min. |
EPDM Class Offerings
Class # | Description | Time |
---|---|---|
EPDM 1 | Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly. | 90 Min. |
EPDM 2 | Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 1” base. Roll on technique with lap sealant. | 90 Min. |
EPDM 3 | Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles. | 90 Min. |
EPDM 4 | Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch. | 90 Min. |
EPDM 5 | Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight. | 60 Min. |
PVC Class Offerings
Class # | Description | Time |
---|---|---|
PVC 1 | Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly. | 90 Min. |
PVC 2 | Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot including T-Patch, 8” minimum pipe covering, and 2” base | 90 Min. |
PVC 3 | Outside Corner: Baker Best Practices for wrapping curb, installing screws, and installing outside corners with proper coverage and no wrinkles or bubbles. | 90 Min. |
PVC 4 | Inside Corner: Baker Best Practices with Two T-Patches, Pig Ear fold technique, and proper location of pig ear covered correctly with second T-Patch. | 90 Min. |
PVC 5 | Roof Drain: Baker Best Practice for installing drain. Showing the steps from the bottom up, including how to install bolts and make the drain water tight. | 60 Min. |
MOD BIT Class Offerings
Class # | Description | Time |
---|---|---|
MOD BIT 1 | Seam Repair: Baker best practice for repairing damaged membranes. Using membrane or cover-strip depending on the damage, fixing the damage properly. | 90 Min. |
MOD BIT 2 | Field Wraps: Baker Best practice for achieving proper field-fabricated pipe boot with 8” pipe covering, 2” fingers around the pipe, and a 12”x12” target patch. | 90 Min. |
MOD BIT 3 | Outside Corner: Baker Best Practice wrapping a modified curb using the ABBC technique. Installing cant-strips around the curb, putting the base around, wrapping the base with cap-sheet , following the slope of the roof. | 90 Min. |
MOD BIT 4 | Inside Corner: Baker Best Practice using liquid flashing for pipe wraps and scuppers , the proper levels and how much time you have when liquid flashing mix is prepared. | 90 Min. |
Service 201 Class Offerings
Class # | Description | Time |
---|---|---|
Service 201-1 | Conical Pipes: Baker Best Practice for wrapping conical pipes using a simple formula to achieve accurate detail. | 90 Min. |
Service 201-2 | 3/4″ Field Wrap Pipes: Baker Best Practices for achieving proper field-fabricated pipe boot with 8″ pipe covering, 2″ fingers around the pipe, and a 12″x12″ target patch. | 90 Min. |
Service 201-3 | 4pc ModBit Drain Detail: Baker Best Practice wrapping a modified drain using the 4 pc technique. Installing modified drain going step-by-step from start to finish. | 90 Min. |
Service 201-4 | Pitch Pocket Installation: Baker Best Practice using pitch pockets for pipes on the roof. Step-by-step from beginning to end. | 90 Min. |
Edge Metal (ES-1) Class Offerings
Class # | Description | Time |
---|---|---|
Drip Edge 1 | Outside Corner: Baker Best Practices for creating a 45-degree angle on the outside corner of drip edge. | 90 Min. |
Drip Edge 2 | Inside Corner: Baker Best Practice for creating a 45-degree angle on inside corners. | 90 Min. |
Drip Edge 3 | Gravel Stop Inside Corner: Baker Best Practice for gravel stop that creates watertight installation with proper aesthetic. | 90 Min. |
Drip Edge 4 | Gravel Stop Outside Corner: Baker Best Practice for gravel stop that creates watertight installation with proper aesthetic. | 60 Min. |
Drip Edge 5 | Coping Inside & Outside One Piece: Baker Best Practice for coping that creates watertight installation with proper aesthetic. | 120 Min. |
Robot Welder Class Offerings
Class # | Description | Time |
---|---|---|
Robot 1 | Robot Welder: How to properly maintain, calibrate, and turn on an Auto Robot Welder. How to use the robot welder in the field and test the robot welds before use. | 90 Min. |
Drip Edge (Steep) Class Offerings
Class # | Description | Time |
---|---|---|
Drip Edge 1 | Outside Corner: Baker Best Practices for creating a 45 degree angle on the outside corner of drip edge. Correct lapping of drip edge. | 90 Min. |
Drip Edge 2 | Inside Corner: Baker Best Practice for creating 45 degree angle on inside corners. Cutting drip edge to cover valley. | 90 Min. |
Drip Edge 3 | Gable Transition: Baker Best Practice for gable transition drip edge creates watertight installation with proper aesthetic. | 90 Min. |
Drip Edge 4 | Ridge: Baker Best Practice for installing ridge drip edge with one piece and symmetrical appearance. | 60 Min. |
Flashing (Steep) Class Offerings
Class # | Description | Time |
---|---|---|
Residential Flashing 1 | Apron Flashing: Baker best practice for installing apron flashing with clips and correct corner installation. | 90 Min. |
Residential Flashing 2 | Outside Corner: Baker Best Practice for installing pre-cut outside corners and incorporating them into step flashing. | 60 Min. |
Residential Flashing 3 | Inside Corner on a Valley: Baker Best practice for installing apron flashing on a wall at the top of a valley. | 90 Min. |
Residential Flashing 4 | Step Flashing: Baker Best Practice showing proper nail placement and lap coverage. | 60 Min. |
Residential Flashing 5 | Outside Corner on a Hip: Baker Best Practice for installing apron flashing on an outside wall corner on top of a hip. | 90 Min. |
Residential Flashing 6 | Pipe Boot: Baker Best Practice for installing pipe boot flashing with shingle and sealant integration. | 90 Min. |
Asphalt Shingles Class Offerings
Class # | Description | Time |
---|---|---|
Asphalt Shingles 1 | Roof Layout: Baker Best Practice explaining how to measure the roof and pop lines to ensure proper installation. | 60 Min. |
Asphalt Shingles 2 | Step and Nail Patterns: Baker Best Practices showing where to install nails and how to set up step patterns to ensure roof is water tight. | 60 Min. |
Asphalt Shingles 3 | Cap Shingles: Baker Best Practice showing how to create hip starter shingles, cap cuts, proper nail placement and cap termination. | 90 Min. |
Asphalt Shingles 4 | Ridge Vent: Baker Best Practice for installing ridge vent using the proper layout, correct nails, and vent placement. | 60 Min. |
Asphalt Shingles 5 | Rake Edge: Baker Best Practice ensuring the rake edges are clean, straight, and neat. | 60 Min. |
Skylights Class Offerings
Class # | Description | Time |
---|---|---|
Skylights 1 | Deck Mounted Skylights: Baker Best Practice for installing Suntek deck mounted skylights using the proper sealant, nail placement, ice and water, and shingle cuts. | 120 Min. |
Gun Nail Training
Training # | Description | Time |
---|---|---|
Training 1 | Training crews to use nail guns at Baker. This covers proper set up, maintenance, nail placement, and nail seating with compressors and nail guns. | 90 Min. |
Sealant Training
Training # | Description | Time |
---|---|---|
Training 2 | Training crews using the proper techniques for installing sealant with Baker Best Practices. | 60 Min. |
Scupper Training
Class # | Description | Time |
---|---|---|
Scupper 1 | Scupper on TPO, PVC, EPDM: How to properly install scuppers while using TPO, PVC, and EPDM. Choose ONE type of membrane for this training. | 120 Min. |
Roofing Basics Seminars - Presentation Only
Seminar # | Description | Time |
---|---|---|
Seminar 1 | Roofing 101 (Low Slope): Basic overview of how a low slope roof system is installed and functions. | 60 Min. |
Seminar 2 | Think Like Water (Steep Slope): Basic overview of how a steep slope roof system is installed and functions. | 60 Min. |
Seminar 3 | Membrane Recognition (Low Slope): Basic overview of how to identify single ply membranes and how to pull scrim on them. | 60 Min. |
Seminar 4 | 25 Tools for Single- Ply (Low Slope): Offered in English/ Spanish. Basic overview of the 25 most common tools and how to pronounce them in both English and Spanish. | 60 Min. |